Why Does It Take So Long for Water Cup Proofing?

Customers often ask "Does it take so long for the water cup to make a sample?"

I have no choice but to understand that customers have this problem because they do not understand the production process of water cups. To address this issue today, let’s briefly talk about what needs to be done for water cup proofing?

1.Production of Sample Cups

The production of the sample cup includes two parts, the production of the lid and the production of the cup body. If there is no mold, the mold must be processed first. At the same time, the mold processing will take 25 days. The new sample needs to be continuously debugged during production, which takes about a week. It takes about 30 days for all the water cups to come down, including the lid and body.

2.Painting Debugging

Regardless of whether it is customized colors or existing finished colors of Zhanyi, these colors still need to be adjusted by professional paint personnel.

At the same time, including the spraying requirements of the cup body and the spraying effect, it needs professional technicians to debug it for many times. To achieve the ideal paint color that satisfies the customer, it takes patience and continuous experimentation to meet it. It takes about 3-5 days.

3.Cup Body Pattern Customization

The proofing time of the cup body pattern is determined according to the difficulty of the pattern. For a simple pattern, it takes about 3 days to complete the sample. However, if it is complicated and requires a high printing process, the time from plate making to sample completion is 7 -10 days or so.


Why Does It Take So Long for Water Cup Proofing

4.Water Cup Color Box Proofing

The proofing time of water cup color box is also determined according to the difficulty of color box production. This time can coincide with the production time of the cup body.

5.Other Accessories Custom Proofing Time

If these auxiliary materials do not need to be determined after the cup body comes out, the proofing time can often overlap with the cup proofing time. If you need to use the cup to determine, the proofing time depends on the difficulty of processing the auxiliary materials.


Therefore, taking a stainless steel vacuum flask proofing as an example, it will take at least 3 days to print the pattern only when the materials are in stock.

If it is the development of a new product, the proofing time is often about 45 days, or even more time.


Dongguan Zhanyi Commodity Technology Co., Ltd. specializes in stainless steel water cups and plastic water cups. It has hundreds of production and processing equipment. It provides customers with more than 1,000 proofings every year. At the same time, it develops more than 100 new products for customers every year, which can satisfy customers for all kinds of water cup proofing . Customers from all over the world are welcome to ask us for samples for evaluation. Welcome to our factory for inspection, and welcome to place orders for cooperation. For information, please visit http://www.umbottle.com